Call Peter now on 0407 080 695
or
Bob on 0423 979 531

Reference Site #3 – Perth Airport

Key Points of this Job

  • The job was at the Domestic Freight terminal - Loading Deck.
  • A good deal of patching was done.
  • Approximately 100 Sq Metres of work was done.
  • There was also an extension of the yard area.
  • An area including the Taxi Rank was reinstated - Yellow sand was used to prepare and compact the area prior to bitumen being laid.